Triple

T11921372
Position Surface form Disambiguated ID Type / Status
Subject Nalubaale Power Station E283663 entity
Predicate adjacentTo P224 FINISHED
Object Kiira Power Station E905286 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Kiira Power Station | Statement: [Nalubaale Power Station, adjacentTo, Kiira Power Station]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Kiira Power Station
Context triple: [Nalubaale Power Station, adjacentTo, Kiira Power Station]
  • A. Kiira Power Station chosen
    Kiira Power Station is a major hydroelectric power plant on the Nile River in Uganda that significantly contributes to the country’s electricity generation.
  • B. Atiamuri Power Station
    Atiamuri Power Station is a hydroelectric power station in New Zealand that generates electricity from the flow of the Waikato River.
  • C. Matla Power Station
    Matla Power Station is a large coal-fired power plant in South Africa that is a major contributor to the country’s electricity generation.
  • D. Duvha Power Station
    Duvha Power Station is a large coal-fired power plant in South Africa that forms part of Eskom’s fleet supplying electricity to the national grid.
  • E. Uri I Power Station
    Uri I Power Station is a major hydroelectric power facility in Jammu and Kashmir, India, utilizing water from the Jhelum River to generate electricity.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab2ce9c48190b5d39511b524f666 completed April 8, 2026, 7:23 p.m.
NER Named-entity recognition batch_69d8e8e1b08481909ed291667035f330 completed April 10, 2026, 12:11 p.m.
NED1 Entity disambiguation (via context triple) batch_69f44033c288819099587af3f895eac5 completed May 1, 2026, 5:54 a.m.
Created at: April 8, 2026, 9:45 p.m.