Triple

T11920057
Position Surface form Disambiguated ID Type / Status
Subject Hinkley Point C nuclear power station E283628 entity
Predicate plannedCommissioning P26282 FINISHED
Object late 2020s LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: late 2020s | Statement: [Hinkley Point C nuclear power station, plannedCommissioning, late 2020s]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: plannedCommissioning
Context triple: [Hinkley Point C nuclear power station, plannedCommissioning, late 2020s]
  • A. commissioningEndDate
    Indicates the date on which the commissioning process or commissioning-related responsibilities are completed or terminated.
  • B. plannedAt chosen
    Indicates that an event, action, or activity is scheduled or intended to occur at a specific time or date.
  • C. plannedFacility
    Indicates that a facility is intended or scheduled to be built, established, or implemented in the future but does not yet exist or operate.
  • D. commissionedInService
    Indicates that an entity was formally brought into active service or duty within a particular organization, role, or context.
  • E. plannedUnder
    Indicates that one entity has been scheduled, organized, or arranged to occur within the scope, authority, or framework of another entity.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab2c07e88190ba13b0d21fd6cf33 completed April 8, 2026, 7:23 p.m.
NER Named-entity recognition batch_69d8e8dff77481908cacf6ad03df34ac completed April 10, 2026, 12:11 p.m.
PD Predicate disambiguation batch_69d8bb3632ac8190b13e53c2b5db7125 completed April 10, 2026, 8:56 a.m.
Created at: April 8, 2026, 9:45 p.m.