Triple

T11920021
Position Surface form Disambiguated ID Type / Status
Subject Hinkley Point A nuclear power station E283628 entity
Predicate operator P179 FINISHED
Object Magnox Ltd E884388 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Magnox Ltd | Statement: [Hinkley Point A nuclear power station, operator, Magnox Ltd]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Magnox Ltd
Context triple: [Hinkley Point A nuclear power station, operator, Magnox Ltd]
  • A. Magnox Ltd chosen
    Magnox Ltd is a UK-based nuclear decommissioning company responsible for managing and dismantling former Magnox nuclear power stations.
  • B. Magnox
    Magnox is an early-generation British gas-cooled, graphite-moderated nuclear reactor design that used natural uranium metal fuel clad in a magnesium-aluminium alloy.
  • C. Babcock International
    Babcock International is a British aerospace, defense, and engineering services company that provides critical support to military and civil organizations, particularly in naval and nuclear sectors.
  • D. United Kingdom Atomic Energy Authority
    The United Kingdom Atomic Energy Authority is a UK government body responsible for overseeing and developing the nation’s civil nuclear energy and fusion research programs.
  • E. Central Electricity Generating Board
    The Central Electricity Generating Board was the state-owned body responsible for electricity generation and bulk transmission in England and Wales from the late 1950s until privatization in the early 1990s.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab2c07e88190ba13b0d21fd6cf33 completed April 8, 2026, 7:23 p.m.
NER Named-entity recognition batch_69d8e8dff77481908cacf6ad03df34ac completed April 10, 2026, 12:11 p.m.
NED1 Entity disambiguation (via context triple) batch_69f440247cf4819084567f6e1005ef04 completed May 1, 2026, 5:54 a.m.
Created at: April 8, 2026, 9:44 p.m.