Triple

T11909258
Position Surface form Disambiguated ID Type / Status
Subject Tower Hill E283350 entity
Predicate interchangeWith P3495 FINISHED
Object DLR at Tower Gateway E788687 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: DLR at Tower Gateway | Statement: [Tower Hill, interchangeWith, DLR at Tower Gateway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: DLR at Tower Gateway
Context triple: [Tower Hill, interchangeWith, DLR at Tower Gateway]
  • A. DLR Lewisham branch
    The DLR Lewisham branch is a Docklands Light Railway route in southeast London running from central Docklands through Greenwich to Lewisham.
  • B. DLR Trauen site
    The DLR Trauen site is a German Aerospace Center (DLR) research facility in Trauen focused on aerospace, propulsion, and related technological development and testing.
  • C. DLR chosen
    DLR (Docklands Light Railway) is an automated light metro system serving the Docklands area and parts of East and Southeast London.
  • D. Heathrow Terminal 5
    Heathrow Terminal 5 is a major passenger terminal at London Heathrow Airport, primarily serving British Airways and known for its modern design and large capacity.
  • E. DLR Columbus Control Center
    The DLR Columbus Control Center is the German Aerospace Center’s mission control facility responsible for operating and monitoring the European Columbus laboratory module on the International Space Station.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab2c07e88190ba13b0d21fd6cf33 completed April 8, 2026, 7:23 p.m.
NER Named-entity recognition batch_69d8e5278eb081909a7ecfe38beeeda9 completed April 10, 2026, 11:55 a.m.
NED1 Entity disambiguation (via context triple) batch_69f418543258819083b49a5bbdc520cd completed May 1, 2026, 3:04 a.m.
Created at: April 8, 2026, 9:44 p.m.