Triple

T11876513
Position Surface form Disambiguated ID Type / Status
Subject Gretna Green E282540 entity
Predicate roadAccess P385 FINISHED
Object A74(M) motorway E65535 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: A74(M) motorway | Statement: [Gretna Green, roadAccess, A74(M) motorway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: A74(M) motorway
Context triple: [Gretna Green, roadAccess, A74(M) motorway]
  • A. A74(M) motorway chosen
    The A74(M) motorway is a major road in Scotland forming part of the key route between Glasgow and the English border, effectively continuing the M74 towards the M6.
  • B. M40 motorway
    The M40 motorway is a major English motorway linking London to Birmingham, serving as a key route through the Midlands and the southeast of England.
  • C. M77 motorway
    The M77 motorway is a major road in Scotland that links Glasgow to Kilmarnock and the southwest, forming part of a key route toward Ayrshire.
  • D. M48 motorway
    The M48 motorway is a major road in the United Kingdom that provides a key cross-border route between England and Wales via the Severn Estuary.
  • E. M42 motorway
    The M42 motorway is a major orbital route in the West Midlands of England that helps divert traffic around Birmingham and connects several key motorways, including the M5, M6, and M40.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab2945d081908a5851c916cbcfb5 completed April 8, 2026, 7:23 p.m.
NER Named-entity recognition batch_69d8be1b6a5c81909a18c54205dda09c completed April 10, 2026, 9:08 a.m.
NED1 Entity disambiguation (via context triple) batch_69ff82dcec0c8190a5e4ac0aafd34504 completed May 9, 2026, 6:54 p.m.
Created at: April 8, 2026, 9:44 p.m.