Triple

T11798369
Position Surface form Disambiguated ID Type / Status
Subject Urban Transportation Development Corporation E280560 entity
Predicate product P490 FINISHED
Object Intermediate Capacity Transit System NE GENERATED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Intermediate Capacity Transit System
Context triple: [Urban Transportation Development Corporation, product, Intermediate Capacity Transit System]
  • A. Intermediate Capacity Transit System chosen
    The Intermediate Capacity Transit System (ICTS) is an automated, medium-capacity rail technology used for urban transit lines that require more capacity than street-level light rail but less than full-scale heavy metro systems.
  • B. Advanced Rapid Transit
    Advanced Rapid Transit is a fully automated, driverless urban rail transit technology developed by Bombardier (now Alstom) and used in several metro and light metro systems worldwide.
  • C. Advance Transit
    Advance Transit is a fare-free regional public bus system serving Lebanon, New Hampshire and surrounding Upper Valley communities.
  • D. Metropolitan Transit System
    The Metropolitan Transit System is the primary public transportation agency serving the San Diego region, operating buses, trolleys, and related transit services.
  • E. Transit Systems
    Transit Systems is a major Australian public transport operator that runs bus services across several cities and regions under government contracts.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab258b808190b1735835c841e3a4 completed April 8, 2026, 7:23 p.m.
Created at: April 8, 2026, 9:42 p.m.