Triple
T11794029
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Darlington Nuclear Generating Station |
E280458
|
entity |
| Predicate | refurbishmentPlannedCompletion |
P101615
|
FINISHED |
| Object | 2020s |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2020s | Statement: [Darlington Nuclear Generating Station, refurbishmentPlannedCompletion, 2020s]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: refurbishmentPlannedCompletion Context triple: [Darlington Nuclear Generating Station, refurbishmentPlannedCompletion, 2020s]
-
A.
renovationCompleted
Indicates that a renovation process for an entity has been fully finished and is no longer in progress.
-
B.
renovatedAfter
Indicates that one entity was renovated at a later time than another entity.
-
C.
renovationPeriod
Indicates the time span during which an object, structure, or entity undergoes renovation or refurbishment.
-
D.
plannedReplacement
Indicates that one entity is intended or scheduled to be replaced by another entity in the future.
-
E.
rebuiltCompletedIn
Indicates that an entity has undergone a rebuilding process that was fully completed in a specified time or event.
- F. None of above. chosen
Provenance (4 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6ab258b808190b1735835c841e3a4 |
completed | April 8, 2026, 7:23 p.m. |
| NER | Named-entity recognition | batch_69d8a5a082d08190a42541396a06ed98 |
completed | April 10, 2026, 7:24 a.m. |
| PD | Predicate disambiguation | batch_69d8a2491f048190853239bc05090bf4 |
completed | April 10, 2026, 7:10 a.m. |
| PDg | Predicate description generation | batch_69d8a43cc0c881909fed7cd759fe90b1 |
completed | April 10, 2026, 7:18 a.m. |
Created at: April 8, 2026, 9:42 p.m.