Triple

T11793397
Position Surface form Disambiguated ID Type / Status
Subject Koror–Babeldaob Bridge E280443 entity
Predicate instanceOf P0 FINISHED
Object bridge in Palau C22181 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: bridge in Palau
Context triple: [Koror–Babeldaob Bridge, instanceOf, bridge in Palau]
  • A. bridge in the Philippines
    A bridge in the Philippines is a man-made structure that spans physical obstacles such as bodies of water, valleys, or roads within the Philippine archipelago to facilitate transportation and connectivity between different areas.
  • B. cross-sea bridge
    A cross-sea bridge is a large-scale transportation structure that spans a body of sea water to connect two land areas, enabling the passage of vehicles, trains, or pedestrians across marine environments.
  • C. bridge in Vietnam
    A bridge in Vietnam is a structural crossing—ranging from historic colonial-era spans to modern cable-stayed icons—that connects regions over rivers, deltas, or urban waterways, supporting transportation, trade, and tourism within the country’s diverse landscapes.
  • D. river bridge chosen
    A river bridge is a structure built to span a river, providing a stable pathway for vehicles, pedestrians, or rail traffic to cross from one bank to the other.
  • E. canal bridge
    A canal bridge is a structure that carries a canal or waterway over an obstacle such as a road, river, or valley, allowing uninterrupted navigation.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab258b808190b1735835c841e3a4 completed April 8, 2026, 7:23 p.m.
Created at: April 8, 2026, 9:42 p.m.