Triple
T11772964
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | A51 Terrain Park |
E279944
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | terrain park |
C14223
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: terrain park Context triple: [A51 Terrain Park, instanceOf, terrain park]
-
A.
deck park
A deck park is an elevated public green space constructed over transportation infrastructure, such as highways or rail lines, to reconnect urban areas and provide recreational and environmental benefits.
-
B.
adventure park
An adventure park is a recreational facility offering a variety of physically engaging and often adrenaline-inducing outdoor activities, such as zip lines, climbing courses, and obstacle challenges, designed for fun, fitness, and exploration.
-
C.
big air venue
chosen
A big air venue is a specialized sports facility featuring a large, steep ramp and landing area designed for athletes to perform high-flying aerial tricks in disciplines like skiing or snowboarding.
-
D.
ski jumping hill
A ski jumping hill is a specially designed, sloped structure with an inrun, takeoff, and landing area that allows ski jumpers to gain speed and safely perform long-distance jumps.
-
E.
mountain park
A mountain park is a protected natural area located in mountainous terrain, offering scenic landscapes, outdoor recreation, and conservation of local ecosystems and wildlife.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6ab01d2688190ad8ed6bda487eaa5 |
completed | April 8, 2026, 7:22 p.m. |
Created at: April 8, 2026, 9:41 p.m.