Triple

T11756239
Position Surface form Disambiguated ID Type / Status
Subject Raigad Ropeway E279532 entity
Predicate instanceOf P0 FINISHED
Object aerial ropeway C12623 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: aerial ropeway
Context triple: [Raigad Ropeway, instanceOf, aerial ropeway]
  • A. cable car system
    A cable car system is a transportation network in which vehicles are pulled by continuously moving cables, typically used to move people or goods along steep or inaccessible routes such as mountainsides or urban hills.
  • B. aerial observation ride
    An aerial observation ride is an amusement attraction that lifts passengers to an elevated height, often rotating or moving slowly, to provide panoramic views of the surrounding area.
  • C. cable car station
    A cable car station is a designated facility where passengers board, disembark, and transfer between cable-propelled vehicles, typically featuring platforms, ticketing areas, and equipment for operating and maintaining the cable system.
  • D. aerial lift chosen
    An aerial lift is a mechanical device, such as a cable-suspended chair, gondola, or platform, used to transport people or materials above the ground, typically in construction, maintenance, or recreational settings.
  • E. Ferris wheel
    A Ferris wheel is a large, rotating upright wheel with passenger cabins attached to its rim, providing riders with elevated, circular views of the surrounding area.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab01038c819080714901502c84fc completed April 8, 2026, 7:22 p.m.
Created at: April 8, 2026, 9:41 p.m.