Triple

T11728533
Position Surface form Disambiguated ID Type / Status
Subject SR E278838 entity
Predicate contrastsWith P278 FINISHED
Object US (for U.S. Route) E174352 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: US (for U.S. Route) | Statement: [SR, contrastsWith, US (for U.S. Route)]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: US (for U.S. Route)
Context triple: [SR, contrastsWith, US (for U.S. Route)]
  • A. U.S. Highway chosen
    A U.S. Highway is a numbered network of major roads that spans multiple states across the United States, facilitating regional and long-distance ground transportation.
  • B. US 9
    US 9 is a major north–south U.S. Highway running along the East Coast, primarily through New Jersey and New York, connecting urban, suburban, and coastal communities.
  • C. U.S. Route 4
    U.S. Route 4 is an east–west United States highway in the Northeast that runs between New York and New Hampshire, connecting cities such as Albany and Portsmouth.
  • D. U.S. 1A
    U.S. 1A is an alternate U.S. Highway in Maine that serves as a parallel or business route to U.S. Route 1 through several coastal communities.
  • E. U.S. Route 5
    U.S. Route 5 is a major north–south United States highway running through New England, primarily paralleling the Connecticut River from Connecticut to the Canadian border.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aaffec6881908bead509e8621742 completed April 8, 2026, 7:22 p.m.
NER Named-entity recognition batch_69d8a4d80ef881908cab956787ab07fd completed April 10, 2026, 7:20 a.m.
NED1 Entity disambiguation (via context triple) batch_69ef83e9efdc8190830f9b9cb5362b1c completed April 27, 2026, 3:42 p.m.
Created at: April 8, 2026, 9:41 p.m.