Triple

T11674266
Position Surface form Disambiguated ID Type / Status
Subject Śāriputra E277451 entity
Predicate attained P1518 FINISHED
Object arahantship LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: arahantship | Statement: [Śāriputra, attained, arahantship]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: attained
Context triple: [Śāriputra, attained, arahantship]
  • A. achieved chosen
    Indicates that an entity successfully reached, obtained, or accomplished a specified goal, result, or state.
  • B. passed
    Indicates that one entity successfully transferred control, responsibility, or an item (such as an object, message, or test) to another entity or through a specified stage or condition.
  • C. admitted
    Indicates that one entity has formally accepted, acknowledged, or allowed another entity or fact, often into a place, group, or state.
  • D. achievedOn
    Indicates that a particular result, milestone, or state was successfully reached or completed at a specific time or date.
  • E. committed
    Indicates that an agent has carried out or been responsible for a specific act, event, or wrongdoing.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aafd0a448190b44da30af8c6c519 completed April 8, 2026, 7:22 p.m.
NER Named-entity recognition batch_69d8a443b6848190a1eb6825fbc49d08 completed April 10, 2026, 7:18 a.m.
PD Predicate disambiguation batch_69d88a77e6e88190b7519100bde76575 completed April 10, 2026, 5:28 a.m.
Created at: April 8, 2026, 9:40 p.m.