Triple
T11653000
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | ایوانِ صدر اسلام آباد |
E276952
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | سرکاری صدارتی محل |
C204
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: سرکاری صدارتی محل Context triple: [ایوانِ صدر اسلام آباد, instanceOf, سرکاری صدارتی محل]
-
A.
government building
chosen
A government building is a structure owned or used by a public authority to house offices, services, and functions related to the administration and governance of a city, region, or country.
-
B.
governmental hall
A governmental hall is a formal public building or chamber where official government functions, legislative sessions, and civic ceremonies are conducted.
-
C.
municipal hall
A municipal hall is a public building that houses the offices and meeting spaces of a local government, serving as the administrative and civic center of a municipality.
-
D.
federal administrative centre
A federal administrative centre is a designated city or district where a nation's central government offices, ministries, and key public institutions are concentrated and coordinated.
-
E.
rectorate
The rectorate is the governing body or office of a rector, responsible for the overall academic, administrative, and strategic leadership of a university or higher education institution.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aafbb3c081908a9cdb4ecb8d981d |
completed | April 8, 2026, 7:22 p.m. |
Created at: April 8, 2026, 9:39 p.m.