Triple

T11615310
Position Surface form Disambiguated ID Type / Status
Subject Comanche Peak Nuclear Power Plant E275488 entity
Predicate gridName P100611 FINISHED
Object ERCOT grid E640595 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: ERCOT grid | Statement: [Comanche Peak Nuclear Power Plant, gridName, ERCOT grid]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: ERCOT grid
Context triple: [Comanche Peak Nuclear Power Plant, gridName, ERCOT grid]
  • A. ERCOT market chosen
    The ERCOT market is the competitive wholesale and retail electricity market operated by the Electric Reliability Council of Texas, covering most of Texas’s power grid.
  • B. Southeastern United States electric grid
    The Southeastern United States electric grid is the interconnected regional power network that delivers electricity across the southeastern states, integrating generation sources like nuclear, coal, natural gas, and renewables to serve homes, businesses, and industry.
  • C. PJM Interconnection
    PJM Interconnection is a regional transmission organization (RTO) that coordinates the movement of wholesale electricity across parts of the eastern United States, operating one of the world’s largest competitive power markets.
  • D. North American power transmission grid
    The North American power transmission grid is the vast, interconnected high-voltage network that delivers electricity across the United States, Canada, and parts of Mexico through several major synchronized interconnections.
  • E. National Grid
    National Grid is a major British multinational electricity and gas utility company responsible for operating and maintaining the high-voltage power transmission network in Great Britain.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: gridName
Context triple: [Comanche Peak Nuclear Power Plant, gridName, ERCOT grid]
  • A. gridRegion
    Indicates a spatial relationship where an entity is located within, or associated with, a specific region or cell of a grid.
  • B. gridType
    Indicates the specific structural or organizational pattern of a grid used to arrange or reference elements.
  • C. networkMapName
    Indicates the designated name or label assigned to a particular network map within a system or context.
  • D. squareName
    Indicates that an entity is identified by or associated with the name of a square (such as a public square or plaza).
  • E. graphNameCanBe
    Indicates that a graph is allowed to take on or be assigned a specified name.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aaf84b548190ac072e4fb89ae18f completed April 8, 2026, 7:22 p.m.
NER Named-entity recognition batch_69d8a04675e08190837a3717242fd0f9 completed April 10, 2026, 7:01 a.m.
NED1 Entity disambiguation (via context triple) batch_69e8a84161d88190a3e810d19d6ea8b8 completed April 22, 2026, 10:51 a.m.
PD Predicate disambiguation batch_69d85dd6503c819081f9045e9d5c4f3f completed April 10, 2026, 2:17 a.m.
PDg Predicate description generation batch_69d87f2e67108190ac36bf47aac12fa8 completed April 10, 2026, 4:40 a.m.
Created at: April 8, 2026, 9:38 p.m.