Triple
T11615291
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Comanche Peak Nuclear Power Plant |
E275488
|
entity |
| Predicate | designedElectricalCapacity_MWe |
P53312
|
FINISHED |
| Object | ~2500 |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: ~2500 | Statement: [Comanche Peak Nuclear Power Plant, designedElectricalCapacity_MWe, ~2500]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: designedElectricalCapacity_MWe Context triple: [Comanche Peak Nuclear Power Plant, designedElectricalCapacity_MWe, ~2500]
-
A.
netElectricalCapacity_MWe
Indicates the relationship specifying an entity’s net electrical power generation capacity, measured in megawatts electric (MWe), after accounting for internal power consumption.
-
B.
grossElectricalCapacity_MWe
Indicates the total electrical power output capacity of a generating unit, measured in megawatts electric (MWe), before accounting for internal power consumption or losses.
-
C.
totalElectricalCapacity_MWe
chosen
Indicates the total electrical power generation capacity, measured in megawatts electric (MWe), that an entity can produce or supply.
-
D.
turbineCapacity
Indicates the power-generating capacity or rated output of a turbine.
-
E.
hydroelectricStationCapacity
Indicates the maximum amount of electrical power that a hydroelectric station is capable of producing under specified conditions.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aaf84b548190ac072e4fb89ae18f |
completed | April 8, 2026, 7:22 p.m. |
| NER | Named-entity recognition | batch_69d8a04675e08190837a3717242fd0f9 |
completed | April 10, 2026, 7:01 a.m. |
| PD | Predicate disambiguation | batch_69d85dd6503c819081f9045e9d5c4f3f |
completed | April 10, 2026, 2:17 a.m. |
Created at: April 8, 2026, 9:38 p.m.