Triple

T11615291
Position Surface form Disambiguated ID Type / Status
Subject Comanche Peak Nuclear Power Plant E275488 entity
Predicate designedElectricalCapacity_MWe P53312 FINISHED
Object ~2500 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: ~2500 | Statement: [Comanche Peak Nuclear Power Plant, designedElectricalCapacity_MWe, ~2500]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: designedElectricalCapacity_MWe
Context triple: [Comanche Peak Nuclear Power Plant, designedElectricalCapacity_MWe, ~2500]
  • A. netElectricalCapacity_MWe
    Indicates the relationship specifying an entity’s net electrical power generation capacity, measured in megawatts electric (MWe), after accounting for internal power consumption.
  • B. grossElectricalCapacity_MWe
    Indicates the total electrical power output capacity of a generating unit, measured in megawatts electric (MWe), before accounting for internal power consumption or losses.
  • C. totalElectricalCapacity_MWe chosen
    Indicates the total electrical power generation capacity, measured in megawatts electric (MWe), that an entity can produce or supply.
  • D. turbineCapacity
    Indicates the power-generating capacity or rated output of a turbine.
  • E. hydroelectricStationCapacity
    Indicates the maximum amount of electrical power that a hydroelectric station is capable of producing under specified conditions.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aaf84b548190ac072e4fb89ae18f completed April 8, 2026, 7:22 p.m.
NER Named-entity recognition batch_69d8a04675e08190837a3717242fd0f9 completed April 10, 2026, 7:01 a.m.
PD Predicate disambiguation batch_69d85dd6503c819081f9045e9d5c4f3f completed April 10, 2026, 2:17 a.m.
Created at: April 8, 2026, 9:38 p.m.