Triple

T1153124
Position Surface form Disambiguated ID Type / Status
Subject San Joaquin River E23721 entity
Predicate hasDam P8736 FINISHED
Object Friant Dam E62555 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Friant Dam | Statement: [San Joaquin River, hasDam, Friant Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Friant Dam
Context triple: [San Joaquin River, hasDam, Friant Dam]
  • A. Friant Dam chosen
    Friant Dam is a major concrete gravity dam on California's San Joaquin River that provides irrigation water, flood control, and hydroelectric power as part of the federal Central Valley Project.
  • B. Perris Dam
    Perris Dam is a large earthfill embankment dam in Riverside County, California, that forms Lake Perris as part of the state’s major water storage and distribution system.
  • C. Folsom Dam
    Folsom Dam is a large concrete dam on the American River in California that provides flood control, water storage, and hydroelectric power for the Sacramento region.
  • D. Castaic Dam
    Castaic Dam is a large embankment dam in Los Angeles County, California, that forms Castaic Lake and plays a key role in water storage and hydroelectric power generation for Southern California.
  • E. Friant-Kern Canal
    The Friant-Kern Canal is a major irrigation and water conveyance canal in California’s San Joaquin Valley that delivers diverted San Joaquin River water to farms and communities across the southern Central Valley.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a493f0d32c8190ac74bad3c87f2641 completed March 1, 2026, 7:30 p.m.
NER Named-entity recognition batch_69a4bc8e9cb481908a528a828b21d497 completed March 1, 2026, 10:24 p.m.
NED1 Entity disambiguation (via context triple) batch_69acb2f3df34819090d942aad0a409fa completed March 7, 2026, 11:21 p.m.
Created at: March 1, 2026, 7:44 p.m.