Triple

T11520556
Position Surface form Disambiguated ID Type / Status
Subject Illinois Route 25 E273148 entity
Predicate hasJunctionWith P1018 FINISHED
Object Illinois Route 64 E187262 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Illinois Route 64 | Statement: [Illinois Route 25, hasJunctionWith, Illinois Route 64]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Illinois Route 64
Context triple: [Illinois Route 25, hasJunctionWith, Illinois Route 64]
  • A. Illinois Route 64 chosen
    Illinois Route 64 is an east–west state highway in northern Illinois that runs through the Chicago metropolitan area and serves communities such as Maywood.
  • B. Illinois Route 68
    Illinois Route 68 is an east–west state highway in northeastern Illinois that serves suburban communities northwest of Chicago.
  • C. Illinois Route 62
    Illinois Route 62 is an east–west state highway in northeastern Illinois that serves as a major arterial road through communities such as Algonquin.
  • D. Illinois Route 56
    Illinois Route 56 is a state highway in northeastern Illinois that connects the western suburbs of Chicago, including areas like Downers Grove, to communities farther west.
  • E. Illinois Route 57
    Illinois Route 57 is a north–south state highway in western Illinois that connects Quincy to Interstate 72 and other regional routes.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aae2c3748190bed2ea50dfb160dc completed April 8, 2026, 7:22 p.m.
NER Named-entity recognition batch_69d87fd129c88190893b95222480e04a completed April 10, 2026, 4:42 a.m.
NED1 Entity disambiguation (via context triple) batch_69f416f5e0588190b432a48bbbc6c762 completed May 1, 2026, 2:59 a.m.
Created at: April 8, 2026, 9:36 p.m.