Triple
T11508970
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | FlexPass |
E272859
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | regional transit pass program |
C13844
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: regional transit pass program Context triple: [FlexPass, instanceOf, regional transit pass program]
-
A.
public transportation funding program
A public transportation funding program is a structured initiative that allocates financial resources to plan, develop, operate, and maintain shared transit services and related infrastructure for the general public.
-
B.
public transit system
A public transit system is an organized network of shared transportation services—such as buses, trains, subways, and trams—designed to move large numbers of people efficiently within and between urban and regional areas.
-
C.
public transportation security program
A public transportation security program is a coordinated set of policies, technologies, and procedures designed to protect passengers, staff, and infrastructure across transit systems from threats, crime, and disruptions.
-
D.
regional transport plan
A regional transport plan is a strategic framework that outlines long-term goals, policies, and coordinated investments for transportation systems across a defined geographic region.
-
E.
transit fare product
chosen
A transit fare product is a purchasable medium (such as a ticket, pass, or stored value) that grants a rider the right to access and use public transportation services under specified conditions.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aae2c3748190bed2ea50dfb160dc |
completed | April 8, 2026, 7:22 p.m. |
Created at: April 8, 2026, 9:36 p.m.