Triple

T11499254
Position Surface form Disambiguated ID Type / Status
Subject Area B (West Bank) E272619 entity
Predicate timeframeIntendedAs P40755 FINISHED
Object interim arrangement pending final agreement LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: interim arrangement pending final agreement | Statement: [Area B (West Bank), timeframeIntendedAs, interim arrangement pending final agreement]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: timeframeIntendedAs
Context triple: [Area B (West Bank), timeframeIntendedAs, interim arrangement pending final agreement]
  • A. timeFrameSpecified
    Indicates that a specific temporal period or duration has been explicitly defined or constrained for the related event, action, or relationship.
  • B. timeframeRelative
    Indicates a temporal relationship where one event, state, or condition is positioned in time relative to another (e.g., before, after, or overlapping).
  • C. timePeriodImplied
    Indicates that a time period is inferred or implied by context rather than being explicitly specified.
  • D. timePeriod
    Indicates the specific span or interval of time during which an event, state, or relationship occurs or is valid.
  • E. intendedDuration chosen
    Indicates the planned or expected length of time for which an action, event, or state is meant to occur or remain in effect.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aae1b09881909ce2ded3fa0c14fa completed April 8, 2026, 7:22 p.m.
NER Named-entity recognition batch_69d85de27db081909ccdb4ab0ef75bdb completed April 10, 2026, 2:18 a.m.
PD Predicate disambiguation batch_69d808736c5c8190899b5b3b2e797f65 completed April 9, 2026, 8:13 p.m.
Created at: April 8, 2026, 9:36 p.m.