Triple

T11486391
Position Surface form Disambiguated ID Type / Status
Subject City of Chicago E272290 entity
Predicate instanceOf P0 FINISHED
Object major U.S. city C21261 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: major U.S. city
Context triple: [City of Chicago, instanceOf, major U.S. city]
  • A. Metropolitan city chosen
    A metropolitan city is a large, densely populated urban area that serves as a central hub for economic, cultural, political, and social activities, often encompassing multiple municipalities and extensive infrastructure.
  • B. city-state
    A city-state is an independent, self-governing urban center that exercises political, economic, and cultural control over its surrounding territory.
  • C. transcontinental city
    A transcontinental city is an urban area whose continuous metropolitan territory spans across two or more continents, often divided by a major geographic boundary such as a strait, sea, or continental border.
  • D. capital city
    A capital city is the municipality designated as the official seat of a country's or region's government, typically hosting its central administrative, legislative, and often judicial institutions.
  • E. metropolitan area
    A metropolitan area is a densely populated urban region consisting of a central city and its surrounding suburbs and satellite communities, linked by economic, social, and infrastructural ties.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aae1b09881909ce2ded3fa0c14fa completed April 8, 2026, 7:22 p.m.
Created at: April 8, 2026, 9:36 p.m.