Triple

T11468574
Position Surface form Disambiguated ID Type / Status
Subject Newton Mearns E271839 entity
Predicate nearMotorway P385 FINISHED
Object M77 motorway E66211 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: M77 motorway | Statement: [Newton Mearns, nearMotorway, M77 motorway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: M77 motorway
Context triple: [Newton Mearns, nearMotorway, M77 motorway]
  • A. M77 motorway chosen
    The M77 motorway is a major road in Scotland that links Glasgow to Kilmarnock and the southwest, forming part of a key route toward Ayrshire.
  • B. M73 motorway
    The M73 motorway is a short connector route in Scotland that links the M74 and M80 motorways and helps channel traffic around the eastern side of Glasgow.
  • C. M57 motorway
    The M57 motorway is a major orbital route in North West England that serves as a bypass around Liverpool, connecting several key motorways and facilitating regional traffic flow.
  • D. M67 motorway
    The M67 motorway is a short motorway in North West England that links the M60 near Manchester towards Hyde and is intended as the first section of a never-completed route to Sheffield.
  • E. M80 motorway
    The M80 motorway is a major road in Scotland connecting Glasgow to Stirling and forming part of the primary route between central Scotland and the north.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aae0c8d881908a5a360c0be3242e completed April 8, 2026, 7:22 p.m.
NER Named-entity recognition batch_69d822f74144819094479690c8151073 completed April 9, 2026, 10:06 p.m.
NED1 Entity disambiguation (via context triple) batch_69fe729766008190803c1dfef2c8c872 completed May 8, 2026, 11:32 p.m.
Created at: April 8, 2026, 9:35 p.m.