Triple

T11463254
Position Surface form Disambiguated ID Type / Status
Subject Dimona nuclear facility E271713 entity
Predicate instanceOf P0 FINISHED
Object research reactor complex C2094 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: research reactor complex
Context triple: [Dimona nuclear facility, instanceOf, research reactor complex]
  • A. research reactor design
    Research reactor design is the conceptual and engineering process of configuring a nuclear reactor’s core, systems, and safety features to produce controlled neutron fluxes for experiments, isotope production, and materials testing rather than for power generation.
  • B. nuclear reactor chosen
    A nuclear reactor is a controlled system that initiates, sustains, and regulates a nuclear fission chain reaction to produce heat, typically for generating electricity or powering ships.
  • C. nuclear reactor project
    A nuclear reactor project is a coordinated engineering and management effort to design, license, construct, operate, and eventually decommission a nuclear reactor facility for energy production, research, or other specialized applications.
  • D. reactor safety research program
    A reactor safety research program is an organized, systematic effort to study, evaluate, and improve the safety, reliability, and risk management of nuclear reactors through experiments, modeling, and analysis.
  • E. uranium processing facility
    A uranium processing facility is an industrial plant where uranium ore is refined, converted, and prepared into nuclear-grade materials for use in fuel production or other nuclear applications.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aae0c8d881908a5a360c0be3242e completed April 8, 2026, 7:22 p.m.
Created at: April 8, 2026, 9:35 p.m.