Triple

T11401908
Position Surface form Disambiguated ID Type / Status
Subject VA 7 E270128 entity
Predicate alsoKnownAs P39 FINISHED
Object Leesburg Pike E262183 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Leesburg Pike | Statement: [VA 7, alsoKnownAs, Leesburg Pike]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Leesburg Pike
Context triple: [VA 7, alsoKnownAs, Leesburg Pike]
  • A. Leesburg Pike chosen
    Leesburg Pike is a primary arterial roadway in Northern Virginia that connects Tysons to other key communities in the Washington, D.C. metropolitan area.
  • B. Rockville Pike
    Rockville Pike is a heavily traveled commercial and commuter artery in Montgomery County, Maryland, lined with shopping centers, offices, and residential developments.
  • C. Arlington Boulevard
    Arlington Boulevard is a major arterial roadway in Northern Virginia that carries U.S. Route 50 through Arlington and Fairfax counties into the Washington, D.C. metropolitan area.
  • D. Columbia Pike
    Columbia Pike is a major historic thoroughfare and commuter route in Northern Virginia that connects Arlington County to Fairfax County and serves as a key corridor into Washington, D.C.
  • E. Richmond Parkway
    Richmond Parkway is a major arterial road in Richmond, California, that connects Interstate 80 with Interstate 580 and serves several residential and commercial areas along the city’s northern and western edges.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aacdbc6c8190af6dc3d5f5d22836 completed April 8, 2026, 7:21 p.m.
NER Named-entity recognition batch_69d80148e2048190a716b515d78efdd1 completed April 9, 2026, 7:43 p.m.
NED1 Entity disambiguation (via context triple) batch_69e5d3470e208190aef43936bac2e4e9 completed April 20, 2026, 7:18 a.m.
Created at: April 8, 2026, 9:34 p.m.