Triple
T11377447
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Terminal 2 (CSMIA) |
E269506
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | international airport terminal |
C81
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: international airport terminal Context triple: [Terminal 2 (CSMIA), instanceOf, international airport terminal]
-
A.
international terminal area
An international terminal area is a designated section of an airport where passengers check in, depart, arrive, and transit for international flights, including associated facilities such as customs, immigration, security, and boarding gates.
-
B.
international airport
chosen
An international airport is a large, complex transportation hub that facilitates the arrival, departure, and transfer of passengers and cargo between countries through scheduled and chartered flights, customs, immigration, and related services.
-
C.
airport lounge
An airport lounge is a designated, often exclusive area within an airport that offers travelers a comfortable place to relax, work, and access amenities such as seating, refreshments, Wi‑Fi, and sometimes showers or business services while waiting for their flights.
-
D.
private aviation terminal
A private aviation terminal is a specialized airport facility that provides exclusive, streamlined services and amenities for private and corporate aircraft, their passengers, and crews.
-
E.
airport system
An airport system is an integrated network of facilities, services, and processes that manages the safe, efficient movement of passengers, cargo, and aircraft within and around an airport.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aacca1048190b39dbbc2174616fa |
completed | April 8, 2026, 7:21 p.m. |
Created at: April 8, 2026, 9:33 p.m.