Triple

T11329599
Position Surface form Disambiguated ID Type / Status
Subject Puss In Boots’ Giant Journey E268306 entity
Predicate instanceOf P0 FINISHED
Object suspended roller coaster C6016 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: suspended roller coaster
Context triple: [Puss In Boots’ Giant Journey, instanceOf, suspended roller coaster]
  • A. launched roller coaster
    A launched roller coaster is a type of roller coaster that uses propulsion systems such as linear motors, hydraulic launches, or compressed air to rapidly accelerate trains to high speeds without relying on a traditional lift hill.
  • B. roller coaster
    A roller coaster is an amusement ride consisting of a track with steep drops, sharp turns, and inversions that carries passengers in open cars for a thrilling, high-speed experience.
  • C. inverted roller coaster chosen
    An inverted roller coaster is a type of roller coaster where the train travels beneath the track with riders’ legs dangling freely, creating intense, suspended-feeling maneuvers and inversions.
  • D. flying roller coaster
    A flying roller coaster is a type of thrill ride where passengers are secured in a prone, face-down position beneath the track to simulate the sensation of free flight through the air.
  • E. suspended monorail
    A suspended monorail is an elevated rail transport system in which vehicles hang from a single overhead track, providing efficient, space-saving urban or interurban transit.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aacb1f0881908c84a349fd1be047 completed April 8, 2026, 7:21 p.m.
Created at: April 8, 2026, 9:32 p.m.