Triple

T11309755
Position Surface form Disambiguated ID Type / Status
Subject 八幡市 E267805 entity
Predicate 交通 P12181 FINISHED
Object 第二京阪道路 E583653 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 第二京阪道路 | Statement: [八幡市, 交通, 第二京阪道路]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: 第二京阪道路
Context triple: [八幡市, 交通, 第二京阪道路]
  • A. Second Keihan Highway chosen
    The Second Keihan Highway is a major expressway in Japan that links the Kyoto and Osaka regions, serving as an important arterial route for traffic in the Kansai area.
  • B. Kyoto-Jukan Expressway
    The Kyoto-Jukan Expressway is a major expressway in Japan that connects the Kyoto area with the northern part of the Kansai region, improving access to the Sea of Japan coast.
  • C. Nishinomiya Expressway
    Nishinomiya Expressway is a regional expressway in Japan that serves the Nishinomiya area, connecting local interchanges to the broader highway network.
  • D. Kinki Expressway
    The Kinki Expressway is a major Japanese expressway serving the Kansai (Kinki) region, facilitating high-speed road travel and regional connectivity around cities such as Osaka and Kyoto.
  • E. Maizuru-Wakasa Expressway
    The Maizuru-Wakasa Expressway is a major regional expressway in Japan that links the Kyoto and Fukui prefecture areas, improving access between inland cities and the Sea of Japan coast.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aaca5c24819083db46a30d86cb34 completed April 8, 2026, 7:21 p.m.
NER Named-entity recognition batch_69d7e9c0b3b88190ac0e3d6a5ad3b9bc completed April 9, 2026, 6:02 p.m.
NED1 Entity disambiguation (via context triple) batch_69e50a70022081908bc74185003a3503 completed April 19, 2026, 5:01 p.m.
Created at: April 8, 2026, 9:32 p.m.