Triple

T11309739
Position Surface form Disambiguated ID Type / Status
Subject 八幡市 E267805 entity
Predicate 河川 P165 FINISHED
Object 淀川 E267806 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 淀川 | Statement: [八幡市, 河川, 淀川]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: 淀川
Context triple: [八幡市, 河川, 淀川]
  • A. 淀川 chosen
    淀川は、滋賀県の琵琶湖を水源として京都・大阪を流れ大阪湾へ注ぐ近畿地方を代表する大河川です。
  • B. 長良川
    長良川 is a major river in central Japan renowned for its clear waters, traditional cormorant fishing, and scenic valleys flowing through Gifu Prefecture.
  • C. 富士川
    富士川は、山梨県と静岡県を流れ駿河湾に注ぐ、日本有数の急流として知られる大河川である。
  • D. 木曽川
    木曽川 is a major river in central Japan that flows through the Kiso Valley and is known for its scenic beauty and historical importance as part of the Nōbi Plain river system.
  • E. 武庫川
    武庫川 is a river in Japan that flows through Hyōgo Prefecture, including parts of Nishinomiya and Amagasaki, before emptying into Osaka Bay.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aaca5c24819083db46a30d86cb34 completed April 8, 2026, 7:21 p.m.
NER Named-entity recognition batch_69d7e9c0b3b88190ac0e3d6a5ad3b9bc completed April 9, 2026, 6:02 p.m.
NED1 Entity disambiguation (via context triple) batch_69e525b4bdb88190b22d64eb65e97d9d completed April 19, 2026, 6:57 p.m.
Created at: April 8, 2026, 9:32 p.m.