Triple

T11290830
Position Surface form Disambiguated ID Type / Status
Subject Alberton E267317 entity
Predicate hasTransportation P105 FINISHED
Object N12 highway E918749 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: N12 highway | Statement: [Alberton, hasTransportation, N12 highway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: N12 highway
Context triple: [Alberton, hasTransportation, N12 highway]
  • A. N12 highway chosen
    The N12 highway is a major South African route that connects Johannesburg with key towns and cities in Mpumalanga and beyond, serving as an important corridor for regional travel and freight.
  • B. N13 highway
    The N13 highway is a major Moroccan road that runs through the Middle Atlas region, connecting towns such as Azrou with other key cities and routes.
  • C. N14 highway
    The N14 highway is a major South African national route connecting Pretoria and Johannesburg with the North West and Northern Cape provinces.
  • D. N8 highway
    The N8 highway is a major Moroccan road that runs across the Middle Atlas region, linking key cities such as Azrou with other important urban and economic centers.
  • E. N3 highway
    The N3 highway is a major South African national route that connects Johannesburg and Durban, serving as a key freight and passenger corridor between the inland economic hub and the east coast.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aac993a08190a6f36445ebaf9a43 completed April 8, 2026, 7:21 p.m.
NER Named-entity recognition batch_69d7e989fdac81909a4a75f1f68b55c6 completed April 9, 2026, 6:01 p.m.
NED1 Entity disambiguation (via context triple) batch_69f75d756bd08190a79adc9a2e6188ed completed May 3, 2026, 2:36 p.m.
Created at: April 8, 2026, 9:32 p.m.