Triple
T11285709
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | George Washington Bridge (Manhattan approach) |
E267180
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | roadway interchange complex |
C3647
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: roadway interchange complex Context triple: [George Washington Bridge (Manhattan approach), instanceOf, roadway interchange complex]
-
A.
elevated expressway
An elevated expressway is a high-capacity roadway built on raised structures above ground level to allow uninterrupted traffic flow over urban streets, railways, or other obstacles.
-
B.
road junction
chosen
A road junction is a point where two or more roads meet or cross, allowing vehicles and pedestrians to change direction or route.
-
C.
bridge–tunnel complex
A bridge–tunnel complex is an integrated transportation structure that combines bridge spans and underwater tunnels to carry traffic across wide bodies of water or other large obstacles.
-
D.
Interstate business loop
An Interstate business loop is a special route that departs from an Interstate Highway to pass through the downtown or commercial center of a nearby city before reconnecting with the same Interstate.
-
E.
Interstate Highway
An Interstate Highway is a high-capacity, limited-access roadway that forms part of a nationwide network designed to support efficient long-distance and high-speed vehicular travel between major cities and regions.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aac993a08190a6f36445ebaf9a43 |
completed | April 8, 2026, 7:21 p.m. |
Created at: April 8, 2026, 9:31 p.m.