Triple

T11238171
Position Surface form Disambiguated ID Type / Status
Subject Washington Canal (planning and engineering) E265998 entity
Predicate instanceOf P0 FINISHED
Object canal project C3383 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: canal project
Context triple: [Washington Canal (planning and engineering), instanceOf, canal project]
  • A. canal chosen
    A canal is a man-made waterway constructed to facilitate transportation, irrigation, drainage, or water management between different locations.
  • B. canal structure
    A canal structure is a man-made or modified waterway feature, such as locks, gates, culverts, or embankments, designed to control, direct, or facilitate the flow and navigation of water within a canal system.
  • C. canal authority
    A canal authority is an organization responsible for managing, operating, and regulating a canal and its associated waterways, infrastructure, and traffic.
  • D. canal infrastructure
    Canal infrastructure encompasses the engineered systems, structures, and facilities—such as channels, locks, dams, embankments, and control mechanisms—designed to manage and support waterborne transport, irrigation, drainage, and water regulation along artificial waterways.
  • E. canal bridge
    A canal bridge is a structure that carries a canal or waterway over an obstacle such as a road, river, or valley, allowing uninterrupted navigation.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aac656d48190b275efaa7d6074ee completed April 8, 2026, 7:21 p.m.
Created at: April 8, 2026, 9:30 p.m.