Triple

T11234849
Position Surface form Disambiguated ID Type / Status
Subject Gajoldoba E265916 entity
Predicate knownFor P22 FINISHED
Object Teesta Barrage E284524 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Teesta Barrage | Statement: [Gajoldoba, knownFor, Teesta Barrage]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Teesta Barrage
Context triple: [Gajoldoba, knownFor, Teesta Barrage]
  • A. Teesta Barrage chosen
    Teesta Barrage is a major irrigation and flood-control structure built across the Teesta River, playing a key role in water management and agriculture in the surrounding region.
  • B. Hathni Kund Barrage
    Hathni Kund Barrage is a major diversion and flood-control structure on the Yamuna River in the Indian state of Haryana, crucial for regulating water supply to northern India.
  • C. Guddu Barrage
    Guddu Barrage is a major irrigation and flood-control structure on the Indus River in Pakistan, crucial for distributing water to agricultural lands in Sindh and Balochistan.
  • D. Rana Pratap Sagar Dam
    Rana Pratap Sagar Dam is a major hydroelectric and irrigation dam in Rajasthan, India, forming part of the Chambal Valley project and creating the Rana Pratap Sagar reservoir.
  • E. Ghataprabha Dam
    Ghataprabha Dam is a major irrigation and hydroelectric dam in Karnataka, India, built across the Ghataprabha River to support agriculture and water supply in the region.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aac656d48190b275efaa7d6074ee completed April 8, 2026, 7:21 p.m.
NER Named-entity recognition batch_69d7e903b8ec81909f9c89776d35c650 completed April 9, 2026, 5:59 p.m.
NED1 Entity disambiguation (via context triple) batch_69e58af8bc988190805168188ed0a6aa completed April 20, 2026, 2:10 a.m.
Created at: April 8, 2026, 9:30 p.m.