Triple

T11234760
Position Surface form Disambiguated ID Type / Status
Subject Teesta Low Dam III E265913 entity
Predicate upstreamFrom P5955 FINISHED
Object Teesta Low Dam IV E269175 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Teesta Low Dam IV | Statement: [Teesta Low Dam III, upstreamFrom, Teesta Low Dam IV]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Teesta Low Dam IV
Context triple: [Teesta Low Dam III, upstreamFrom, Teesta Low Dam IV]
  • A. Teesta Low Dam IV chosen
    Teesta Low Dam IV is a hydroelectric power project built on the Teesta River in the Indian state of West Bengal.
  • B. Teesta Low Dam III
    Teesta Low Dam III is a hydroelectric power project built on the Teesta River in India to generate electricity and help regulate river flow.
  • C. Teesta Barrage
    Teesta Barrage is a major irrigation and flood-control structure built across the Teesta River, playing a key role in water management and agriculture in the surrounding region.
  • D. Mula Dam
    Mula Dam is a major irrigation and water-supply dam built on the Mula River in Maharashtra, India.
  • E. Navilatirtha Dam
    Navilatirtha Dam is a major irrigation and water management structure built across the Malaprabha River in Karnataka, India.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aac656d48190b275efaa7d6074ee completed April 8, 2026, 7:21 p.m.
NER Named-entity recognition batch_69d7e903b8ec81909f9c89776d35c650 completed April 9, 2026, 5:59 p.m.
NED1 Entity disambiguation (via context triple) batch_69e509ea915481909c41a4a89ae6ee80 completed April 19, 2026, 4:59 p.m.
Created at: April 8, 2026, 9:30 p.m.