Triple

T11226112
Position Surface form Disambiguated ID Type / Status
Subject Bean Station, Tennessee E265696 entity
Predicate highway P385 FINISHED
Object U.S. Route 25E NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: U.S. Route 25E | Statement: [Bean Station, Tennessee, highway, U.S. Route 25E]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: U.S. Route 25E
Context triple: [Bean Station, Tennessee, highway, U.S. Route 25E]
  • A. U.S. Route 250
    U.S. Route 250 is a U.S. highway running generally northeast–southwest through several states in the eastern United States, connecting rural areas, small towns, and regional cities.
  • B. U.S. Route 259
    U.S. Route 259 is a north–south U.S. highway in Texas and Oklahoma that serves as a regional connector through several communities, including parts of East Texas.
  • C. U.S. Route 25W
    U.S. Route 25W is a major north–south U.S. highway in the southeastern United States that runs through eastern Tennessee and southeastern Kentucky, serving as one of two branches of U.S. Route 25.
  • D. U.S. Route 25
    U.S. Route 25 is a major north–south United States highway that runs from Brunswick, Georgia, to the Ohio–Michigan state line, connecting numerous cities across the southeastern and midwestern U.S.
  • E. U.S. Route 278
    U.S. Route 278 is a major east–west United States highway that runs from Arkansas through the Deep South to the Atlantic coast, connecting numerous cities and rural areas along its multi-state corridor.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: U.S. Route 25E
Target entity description: U.S. Route 25E is a major north–south U.S. highway in the Appalachian region that serves as a key corridor through eastern Tennessee and southeastern Kentucky, including the area around Bean Station.
  • A. U.S. Route 250
    U.S. Route 250 is a U.S. highway running generally northeast–southwest through several states in the eastern United States, connecting rural areas, small towns, and regional cities.
  • B. U.S. Route 259
    U.S. Route 259 is a north–south U.S. highway in Texas and Oklahoma that serves as a regional connector through several communities, including parts of East Texas.
  • C. U.S. Route 25W chosen
    U.S. Route 25W is a major north–south U.S. highway in the southeastern United States that runs through eastern Tennessee and southeastern Kentucky, serving as one of two branches of U.S. Route 25.
  • D. U.S. Route 25
    U.S. Route 25 is a major north–south United States highway that runs from Brunswick, Georgia, to the Ohio–Michigan state line, connecting numerous cities across the southeastern and midwestern U.S.
  • E. U.S. Route 278
    U.S. Route 278 is a major east–west United States highway that runs from Arkansas through the Deep South to the Atlantic coast, connecting numerous cities and rural areas along its multi-state corridor.
  • F. None of above.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aac656d48190b275efaa7d6074ee completed April 8, 2026, 7:21 p.m.
NER Named-entity recognition batch_69d7e8ee15d4819087449058addef597 completed April 9, 2026, 5:59 p.m.
Created at: April 8, 2026, 9:30 p.m.