Triple
T11222870
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Yarramundi Reach |
E265615
|
entity |
| Predicate | near |
P350
|
FINISHED |
| Object | Scrivener Dam |
E147549
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Scrivener Dam | Statement: [Yarramundi Reach, near, Scrivener Dam]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Scrivener Dam Context triple: [Yarramundi Reach, near, Scrivener Dam]
-
A.
Scrivener Dam
chosen
Scrivener Dam is a concrete gravity dam in Canberra, Australia, built across the Molonglo River to create Lake Burley Griffin as the city’s central ornamental lake.
-
B.
Pathfinder Dam
Pathfinder Dam is a historic early 20th-century masonry dam in Wyoming that forms Pathfinder Reservoir and provides water storage and flood control on the North Platte River.
-
C.
Merwin Dam
Merwin Dam is a hydroelectric dam on Washington State’s Lewis River that forms Lake Merwin and generates power for the region.
-
D.
Belver Dam
Belver Dam is a hydroelectric dam on the Tagus River in Portugal, used primarily for power generation and river flow regulation.
-
E.
C.J. Strike Dam
C.J. Strike Dam is a hydroelectric and irrigation dam on the Snake River in southwestern Idaho, forming C.J. Strike Reservoir and supporting regional power generation, recreation, and wildlife habitat.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aac59460819089b9848b27f57848 |
completed | April 8, 2026, 7:21 p.m. |
| NER | Named-entity recognition | batch_69d7e8ec8fb08190b27144ab65f85957 |
completed | April 9, 2026, 5:59 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69f01869e6c8819093f2768b57b183aa |
completed | April 28, 2026, 2:16 a.m. |
Created at: April 8, 2026, 9:30 p.m.