Triple

T11217871
Position Surface form Disambiguated ID Type / Status
Subject Île Longue E265483 entity
Predicate partOf P40 FINISHED
Object Brest naval base complex E270377 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Brest naval base complex | Statement: [Île Longue, partOf, Brest naval base complex]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Brest naval base complex
Context triple: [Île Longue, partOf, Brest naval base complex]
  • A. Brest naval base chosen
    Brest naval base is a major French naval installation on the Atlantic coast that serves as a key home port and operational hub for France’s surface fleet.
  • B. Vladivostok naval base
    Vladivostok naval base is a major Russian naval installation on the Pacific coast, serving as a key strategic hub for the country’s Pacific Fleet.
  • C. Naval Base Świnoujście
    Naval Base Świnoujście is a major Polish naval installation on the Baltic Sea, serving as a key hub for maritime defense and fleet operations.
  • D. Yalta Sea Port
    Yalta Sea Port is a major maritime harbor and transportation hub serving the resort city of Yalta on the southern coast of the Crimean Peninsula.
  • E. Port of Chornomorsk
    The Port of Chornomorsk is a major Ukrainian Black Sea seaport and transport hub near Odesa, handling significant cargo and passenger traffic.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aac59460819089b9848b27f57848 completed April 8, 2026, 7:21 p.m.
NER Named-entity recognition batch_69d7e8ea19e8819095d5d02c1f145534 completed April 9, 2026, 5:59 p.m.
NED1 Entity disambiguation (via context triple) batch_69e4976f38788190855aed6338d819b7 completed April 19, 2026, 8:50 a.m.
Created at: April 8, 2026, 9:30 p.m.