Triple

T111880
Position Surface form Disambiguated ID Type / Status
Subject Heavenly Gondola E2265 entity
Predicate instanceOf P0 FINISHED
Object aerial tramway C1080 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: aerial tramway
Context triple: [Heavenly Gondola, instanceOf, aerial tramway]
  • A. cable car system chosen
    A cable car system is a transportation network in which vehicles are pulled by continuously moving cables, typically used to move people or goods along steep or inaccessible routes such as mountainsides or urban hills.
  • B. people mover system
    A people mover system is an automated transportation network designed to efficiently move passengers over short to medium distances within confined areas such as airports, campuses, or urban centers.
  • C. elevated railway
    An elevated railway is a rail transport system in which tracks and stations are built on raised structures above ground level, typically supported by columns or girders, to avoid interference with street traffic.
  • D. suspension bridge
    A suspension bridge is a type of bridge in which the deck is hung below large main cables that are anchored at each end and pass over tall towers, allowing it to span long distances.
  • E. airlift
    Airlift is a logistical operation that transports people, equipment, or supplies by aircraft, typically over long distances or into areas difficult to reach by land or sea.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a24fcdaeb48190a2d796677e4b3281 completed Feb. 28, 2026, 2:15 a.m.
Created at: Feb. 28, 2026, 2:20 a.m.