Triple
T11116337
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Citi Movement (Griot New York) |
E262893
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | orchestral jazz work |
C4311
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: orchestral jazz work Context triple: [Citi Movement (Griot New York), instanceOf, orchestral jazz work]
-
A.
orchestral composition
chosen
An orchestral composition is a structured musical work written for performance by an orchestra, organizing multiple instrument families into coordinated parts to create a unified artistic expression.
-
B.
work for piano and orchestra
A work for piano and orchestra is a concert piece in which a solo piano part interacts with and is accompanied by a full orchestral ensemble, often highlighting virtuosic and expressive dialogue between the two.
-
C.
symphony orchestra
A symphony orchestra is a large ensemble of musicians playing grouped families of instruments—strings, woodwinds, brass, and percussion—under a conductor to perform complex, often multi-movement musical works.
-
D.
avant-garde jazz composition
An avant-garde jazz composition is an experimental musical work that challenges traditional jazz structures through unconventional harmonies, rhythms, forms, and improvisational approaches to explore new sonic possibilities.
-
E.
orchestral section
An orchestral section is a group of instruments within an orchestra, such as strings, woodwinds, brass, or percussion, that share similar timbres and musical roles.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aa9b46cc8190b19f9f0cc45bf322 |
completed | April 8, 2026, 7:20 p.m. |
Created at: April 8, 2026, 9:27 p.m.