Triple

T11087304
Position Surface form Disambiguated ID Type / Status
Subject MRT Kajang Line E262154 entity
Predicate signalling P19148 FINISHED
Object CBTC E340578 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: CBTC | Statement: [MRT Kajang Line, signalling, CBTC]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: CBTC
Context triple: [MRT Kajang Line, signalling, CBTC]
  • A. CBTC chosen
    CBTC (Communications-Based Train Control) is an advanced railway signalling system that uses continuous, high-capacity data communication to manage train movements with greater safety and efficiency.
  • B. Siemens Trainguard MT
    Siemens Trainguard MT is a communications-based train control (CBTC) signaling system developed by Siemens for fully automated and driverless metro and urban rail operations.
  • C. CTCS-3
    CTCS-3 is a high-level Chinese Train Control System standard used for advanced, high-speed railway signaling and train operation control.
  • D. Automatic Train Operation (ATO)
    Automatic Train Operation (ATO) is a railway control system that automates key driving functions such as acceleration, speed regulation, and braking to improve safety, efficiency, and consistency of train operations.
  • E. CTC
    CTC is the California Tahoe Conservancy, a state agency focused on environmental protection, public access, and resource management in the Lake Tahoe Basin.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa9983c08190b0ef61603b69feac completed April 8, 2026, 7:20 p.m.
NER Named-entity recognition batch_69d799c5008081908f59612243fa4f7a completed April 9, 2026, 12:21 p.m.
NED1 Entity disambiguation (via context triple) batch_69e3e7a6dfa8819096f822294eb64dd1 completed April 18, 2026, 8:20 p.m.
Created at: April 8, 2026, 9:27 p.m.