Triple
T110438
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | puddling process |
E2236
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | ironmaking process |
C682
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: ironmaking process Context triple: [puddling process, instanceOf, ironmaking process]
-
A.
steelmaking process
The steelmaking process is an industrial sequence of operations that transforms iron ore and scrap into refined steel by removing impurities, adjusting chemical composition, and controlling temperature and structure to achieve desired material properties.
-
B.
metallurgical process
chosen
A metallurgical process is a series of physical and chemical operations used to extract, refine, and shape metals from their ores or recycled materials into usable forms with desired properties.
-
C.
nuclear reaction mechanism
A nuclear reaction mechanism is the detailed sequence of interactions and intermediate steps by which incident particles induce changes in a nucleus, leading to specific reaction products and energy release.
-
D.
thermionic valve
A thermionic valve is an electronic device that controls the flow of electrons in a vacuum or gas-filled tube using heated cathodes and electrodes to amplify, rectify, or switch electrical signals.
-
E.
line of fortifications
A line of fortifications is a connected series of defensive structures, such as walls, trenches, and strongpoints, designed to protect a territory or position by forming a continuous or coordinated barrier against attack.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a24fcdaeb48190a2d796677e4b3281 |
completed | Feb. 28, 2026, 2:15 a.m. |
Created at: Feb. 28, 2026, 2:20 a.m.