Triple

T11040412
Position Surface form Disambiguated ID Type / Status
Subject Barcelona metropolitan transport network E260998 entity
Predicate instanceOf P0 FINISHED
Object integrated transport system C911 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: integrated transport system
Context triple: [Barcelona metropolitan transport network, instanceOf, integrated transport system]
  • A. integrated transportation and hospitality system
    An integrated transportation and hospitality system is a coordinated network that seamlessly combines travel services (such as flights, trains, and local transit) with lodging, amenities, and guest services into a unified, end-to-end customer experience.
  • B. public transit system chosen
    A public transit system is an organized network of shared transportation services—such as buses, trains, subways, and trams—designed to move large numbers of people efficiently within and between urban and regional areas.
  • C. continuous transport system
    A continuous transport system is a material handling arrangement that moves goods or resources in an uninterrupted flow along a fixed path using devices such as conveyors, pipelines, or automated tracks.
  • D. public transportation infrastructure
    Public transportation infrastructure encompasses the physical and organizational systems—such as buses, trains, stations, tracks, and supporting facilities—that enable the efficient movement of people via shared transit services.
  • E. public transport information system
    A public transport information system is a software platform that collects, processes, and disseminates real-time and scheduled data about public transit services to passengers, operators, and other stakeholders.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa979bdc8190bf0e79104cc098c1 completed April 8, 2026, 7:20 p.m.
Created at: April 8, 2026, 9:26 p.m.