Triple

T1103544
Position Surface form Disambiguated ID Type / Status
Subject Shawmut Center E25435 entity
Predicate instanceOf P0 FINISHED
Object planned arena name C259 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: planned arena name
Context triple: [Shawmut Center, instanceOf, planned arena name]
  • A. planned city
    A planned city is an urban area whose layout, infrastructure, and land use are deliberately designed and constructed according to a comprehensive plan before significant settlement occurs.
  • B. amphitheater
    An amphitheater is an open or semi-open circular or oval venue with tiered seating surrounding a central performance area, designed to host public events, performances, or gatherings.
  • C. urban plaza
    An urban plaza is a publicly accessible open space within a city, typically surrounded by buildings and streets, designed to support social interaction, circulation, and civic activities.
  • D. multi-purpose stadium chosen
    A multi-purpose stadium is a large, versatile venue designed to host a variety of events, such as sports games, concerts, and community gatherings, by accommodating different configurations and audiences.
  • E. convention center
    A convention center is a large, purpose-built facility designed to host conferences, trade shows, exhibitions, and other large-scale events, providing flexible meeting spaces and supporting services.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a49428d4448190b3b36991ceae87ce completed March 1, 2026, 7:31 p.m.
Created at: March 1, 2026, 7:43 p.m.