Triple

T11023608
Position Surface form Disambiguated ID Type / Status
Subject Vikram Sarabhai Space Centre E260557 entity
Predicate instanceOf P0 FINISHED
Object space research and development centre C14250 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: space research and development centre
Context triple: [Vikram Sarabhai Space Centre, instanceOf, space research and development centre]
  • A. space research centre chosen
    A space research centre is an institution dedicated to the scientific study, exploration, and technological development related to outer space and celestial phenomena.
  • B. spaceflight center
    A spaceflight center is a facility dedicated to the planning, development, testing, and control of spacecraft and space missions.
  • C. rocket research institute
    A rocket research institute is an organization dedicated to the scientific study, design, testing, and advancement of rocket technologies and related space propulsion systems.
  • D. NASA center
    A NASA center is a major facility or campus operated by the National Aeronautics and Space Administration that conducts research, development, testing, and mission operations in specific areas of aerospace and space exploration.
  • E. space agency
    A space agency is an organization, typically government-funded, responsible for planning, developing, and conducting space missions, research, and related technologies.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa9687448190b28d353b1b6a610e completed April 8, 2026, 7:20 p.m.
Created at: April 8, 2026, 9:25 p.m.