Triple
T1102154
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Shibuya Crossing |
E25403
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | pedestrian scramble crossing |
C3647
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: pedestrian scramble crossing Context triple: [Shibuya Crossing, instanceOf, pedestrian scramble crossing]
-
A.
pedestrian bridge
A pedestrian bridge is a raised structure designed exclusively for people on foot (and often cyclists) to safely cross obstacles such as roads, railways, or waterways without interacting with vehicular traffic.
-
B.
pedestrian walkway
A pedestrian walkway is a designated path or corridor intended exclusively or primarily for people traveling on foot, providing safe and convenient passage separated from vehicular traffic.
-
C.
pedestrian skybridge
A pedestrian skybridge is an elevated, enclosed or open walkway that connects two or more buildings above ground level, allowing people to cross safely and conveniently without interacting with street traffic.
-
D.
road junction
chosen
A road junction is a point where two or more roads meet or cross, allowing vehicles and pedestrians to change direction or route.
-
E.
traffic circle
A traffic circle is a circular intersection where vehicles travel counterclockwise around a central island, yielding to circulating traffic to manage flow and reduce conflict points.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a49428d4448190b3b36991ceae87ce |
completed | March 1, 2026, 7:31 p.m. |
Created at: March 1, 2026, 7:43 p.m.