Triple

T1102154
Position Surface form Disambiguated ID Type / Status
Subject Shibuya Crossing E25403 entity
Predicate instanceOf P0 FINISHED
Object pedestrian scramble crossing C3647 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: pedestrian scramble crossing
Context triple: [Shibuya Crossing, instanceOf, pedestrian scramble crossing]
  • A. pedestrian bridge
    A pedestrian bridge is a raised structure designed exclusively for people on foot (and often cyclists) to safely cross obstacles such as roads, railways, or waterways without interacting with vehicular traffic.
  • B. pedestrian walkway
    A pedestrian walkway is a designated path or corridor intended exclusively or primarily for people traveling on foot, providing safe and convenient passage separated from vehicular traffic.
  • C. pedestrian skybridge
    A pedestrian skybridge is an elevated, enclosed or open walkway that connects two or more buildings above ground level, allowing people to cross safely and conveniently without interacting with street traffic.
  • D. road junction chosen
    A road junction is a point where two or more roads meet or cross, allowing vehicles and pedestrians to change direction or route.
  • E. traffic circle
    A traffic circle is a circular intersection where vehicles travel counterclockwise around a central island, yielding to circulating traffic to manage flow and reduce conflict points.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a49428d4448190b3b36991ceae87ce completed March 1, 2026, 7:31 p.m.
Created at: March 1, 2026, 7:43 p.m.