Triple
T11017367
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Norwegian levies |
E260397
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | peasant militia system |
C27364
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: peasant militia system Context triple: [Norwegian levies, instanceOf, peasant militia system]
-
A.
militia system
chosen
A militia system is a framework in which civilian citizens are organized, trained, and mobilized as a part-time military force for local or national defense, typically supplementing or replacing a standing professional army.
-
B.
military system
A military system is an organized structure of personnel, equipment, doctrines, and processes designed to plan, conduct, and support defense and combat operations.
-
C.
peasant revolt
A peasant revolt is a collective uprising of rural agricultural workers against established authorities or landowners, typically driven by economic hardship, social injustice, and political oppression.
-
D.
village guard system
A village guard system is an organized framework of people, procedures, and tools dedicated to monitoring, protecting, and responding to threats within a village community.
-
E.
agrarian political organization
An agrarian political organization is a group that advocates for the interests, rights, and policy priorities of rural communities and agricultural producers within a political system.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aa9687448190b28d353b1b6a610e |
completed | April 8, 2026, 7:20 p.m. |
Created at: April 8, 2026, 9:25 p.m.