Triple
T11016437
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Application Kit |
E260377
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Cocoa framework |
C17572
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Cocoa framework Context triple: [Application Kit, instanceOf, Cocoa framework]
-
A.
macOS framework
chosen
A macOS framework is a bundled collection of libraries, resources, and metadata that provides reusable functionality and APIs for building applications on the macOS platform.
-
B.
Objective-C technology
Objective-C technology is an object-oriented programming language and runtime used primarily for developing software on Apple's macOS and iOS platforms, extending C with Smalltalk-style messaging.
-
C.
graphical user interface framework
A graphical user interface framework is a collection of tools, libraries, and components that simplifies building, organizing, and managing interactive visual elements of software applications.
-
D.
cross-platform UI framework
A cross-platform UI framework is a software toolkit that enables developers to build user interfaces once and deploy them across multiple operating systems and devices with minimal platform-specific changes.
-
E.
UI framework
A UI framework is a collection of tools, libraries, and components that provide a structured way to build, style, and manage user interfaces for applications.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aa9687448190b28d353b1b6a610e |
completed | April 8, 2026, 7:20 p.m. |
Created at: April 8, 2026, 9:25 p.m.