Triple
T10904232
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Volk’s Electric Railway |
E257525
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | seafront railway |
C3787
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: seafront railway Context triple: [Volk’s Electric Railway, instanceOf, seafront railway]
-
A.
railway line
chosen
A railway line is a fixed transportation route consisting of tracks, signaling, and related infrastructure along which trains operate between defined locations.
-
B.
public railway
A public railway is a government- or publicly-owned rail transport system that provides scheduled passenger and/or freight services accessible to the general population, typically operating on standardized tracks and infrastructure.
-
C.
rail
A rail is a long, rigid bar or track, typically made of metal or wood, used to guide, support, or confine movement along a fixed path.
-
D.
rail
A rail is a long, continuous bar or track that provides guidance, support, or a running surface for vehicles, objects, or people in transportation or structural systems.
-
E.
railway portal
A railway portal is a structural entrance or gateway, typically at the mouth of a tunnel or major rail facility, that marks the transition between open track and enclosed or specialized railway infrastructure.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aa8550c8819095508a2ed9acf3db |
completed | April 8, 2026, 7:20 p.m. |
Created at: April 8, 2026, 9:22 p.m.