Triple
T10898522
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Kennedy Mine |
E257372
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | hard-rock mine |
C28960
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: hard-rock mine Context triple: [Kennedy Mine, instanceOf, hard-rock mine]
-
A.
coal mine
A coal mine is an industrial site where coal is extracted from underground or surface deposits for use as fuel and raw material.
-
B.
copper mine
A copper mine is an industrial site where copper ore is extracted from the earth, processed, and refined for use in manufacturing and construction.
-
C.
silver mine
A silver mine is an industrial site where silver-bearing ore is extracted from the earth, processed, and refined into usable silver.
-
D.
gold mine
A gold mine is a site or operation where gold-bearing ore is extracted from the earth and processed to recover usable gold.
-
E.
open-pit diamond mine
An open-pit diamond mine is a large, terraced surface excavation where overburden and rock are removed in successive benches to expose and extract diamond-bearing ore.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aa8550c8819095508a2ed9acf3db |
completed | April 8, 2026, 7:20 p.m. |
Created at: April 8, 2026, 9:21 p.m.