Triple

T10856874
Position Surface form Disambiguated ID Type / Status
Subject Bramley-Moore Dock E256289 entity
Predicate partOfProject P10 FINISHED
Object Liverpool Waters regeneration scheme E252085 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Liverpool Waters regeneration scheme | Statement: [Bramley-Moore Dock, partOfProject, Liverpool Waters regeneration scheme]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Liverpool Waters regeneration scheme
Context triple: [Bramley-Moore Dock, partOfProject, Liverpool Waters regeneration scheme]
  • A. Liverpool Waters regeneration scheme chosen
    The Liverpool Waters regeneration scheme is a major long-term waterfront redevelopment project in Liverpool, England, transforming former docklands into a mixed-use district of residential, commercial, and leisure spaces.
  • B. Lancaster riverside regeneration
    Lancaster riverside regeneration is an urban redevelopment project transforming Lancaster’s riverfront area into a modern, accessible, and attractive public and commercial space.
  • C. Hull Maritime City project
    The Hull Maritime City project is a major heritage-led regeneration initiative in Kingston upon Hull that revitalizes the city’s maritime assets, museums, and waterfront to celebrate its seafaring history and boost tourism.
  • D. Royal Arsenal Riverside regeneration project
    The Royal Arsenal Riverside regeneration project is a major mixed-use redevelopment transforming the historic Royal Arsenal site in Woolwich into a modern residential, commercial, and cultural riverside district.
  • E. Belfast city centre waterfront regeneration
    Belfast city centre waterfront regeneration is a major urban redevelopment initiative transforming former docklands and industrial waterfront areas into a mixed-use district of housing, business, culture, and tourism.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa83d1448190a66d93c32394d21f completed April 8, 2026, 7:20 p.m.
NER Named-entity recognition batch_69d7513695ac8190b5812e977a422c37 completed April 9, 2026, 7:11 a.m.
NED1 Entity disambiguation (via context triple) batch_69dff7d0403c8190bc0b92197a25d3ee completed April 15, 2026, 8:40 p.m.
Created at: April 8, 2026, 9:20 p.m.