Triple

T10834979
Position Surface form Disambiguated ID Type / Status
Subject Sulawesi region E255729 entity
Predicate instanceOf P0 FINISHED
Object island region C445 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: island region
Context triple: [Sulawesi region, instanceOf, island region]
  • A. island province
    An island province is an administrative region consisting entirely of one or more islands, geographically separated from a country's mainland but governed as an integral part of the national territory.
  • B. island province
    An island province is a territorial and administrative division of a country that consists entirely of one or more islands, often with distinct geographic, cultural, and economic characteristics shaped by its maritime setting.
  • C. island chosen
    An island is a landmass completely surrounded by water, smaller than a continent and isolated from other substantial land areas.
  • D. island district
    An island district is an administrative or urban area composed primarily of one or more islands, often characterized by geographic separation from the mainland and distinct local governance, infrastructure, and community identity.
  • E. subregion of Oceania
    A subregion of Oceania is a geographically and culturally defined area within the broader Oceania region, such as Polynesia, Micronesia, or Melanesia.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa81a5d08190aa86689061d1ddd2 completed April 8, 2026, 7:20 p.m.
Created at: April 8, 2026, 9:19 p.m.