Triple

T1083291
Position Surface form Disambiguated ID Type / Status
Subject Dallas Area Rapid Transit E23995 entity
Predicate instanceOf P0 FINISHED
Object public transportation authority C220 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: public transportation authority
Context triple: [Dallas Area Rapid Transit, instanceOf, public transportation authority]
  • A. public transportation agency chosen
    A public transportation agency is an organization responsible for planning, operating, and managing shared transit services such as buses, trains, and other modes to provide mobility for the public within a defined region.
  • B. mass transit operator
    A mass transit operator is an entity responsible for managing, coordinating, and providing public transportation services such as buses, trains, or subways within a specific region or network.
  • C. public transit system
    A public transit system is an organized network of shared transportation services—such as buses, trains, subways, and trams—designed to move large numbers of people efficiently within and between urban and regional areas.
  • D. public transportation infrastructure
    Public transportation infrastructure encompasses the physical and organizational systems—such as buses, trains, stations, tracks, and supporting facilities—that enable the efficient movement of people via shared transit services.
  • E. public transit safety oversight agency
    A public transit safety oversight agency is a governmental or quasi-governmental body responsible for setting, monitoring, and enforcing safety standards and practices across public transportation systems to protect passengers, workers, and the public.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a493f1ddf48190a99d54b00e99f8ce completed March 1, 2026, 7:30 p.m.
Created at: March 1, 2026, 7:42 p.m.